Installation Procedure


 

Step 1 : DRILLING

Use regular procedures, working to diameters specified, by using the recommended drill size

     
 

Step 2 : TAPPING

FASTMAN Tapping is done using one or more of the Taps. Cut full threads to a depth well beyond the length of the insert

     
 
Step 3 : INSTALLING INSERTS

Prewinder Type FASTMAN Inserting Tool aligns and precompresses the insert for easy installation. A slotted mandrel in the tool drives the insert by its tang.
     
 
Step 4 : REMOVING INSERT TANGS

The tang on a FASTMAN Insert should be removed after installation only when necessary for screw clearance or product appearance, and in such cases notched inserts should be used. The tang breaking operation is accomplished by placing the punch of the Tang Break-off Tool into the installed insert and resting tool squarely in the insert tang. The top of the tool is then struck by a hammer, using a sharp blow to remove the tang.
     
 
Step 5 : EXTRACTING INSERTS

Improperly fitted inserts needs to be removed. In such cases FASTMAN Extracting Tools are used. The sharp blade of the Tool bites into the top coil after being hit with a hammer. By applying pressure on the tool and rotating counterclockwise the insert is taken out of the tapped hole.
To summarize ..
Installing of NAG FASTMAN Screw Thread Inserts requires the user to ..
Step 1 Step 2
Step 3
   
Drill Tap Install   FIXED

Copyright (c) 2010.Nag Fastman. All rights reserved
Maintained by Chakra Web Consultant